Search through curated knowledge and find what you need — fast.
Question: What is the process timeline from start to finish?
General
Answer: Stage 1: Consultation We start with space planning and give you an immediate quotation. Once you're happy, sign up by paying a deposit. Stage 2: Site Measurement We visit your home to take initial measurements. After 1-2 weeks, we provide a 3D design. You finalize the layout, including electrical and plumbing plans. Stage 3: Site Preparation Electrical and plumbing work (M&E) is carried out based on your contractor’s schedule. We return to take a final measurement after the site is ready. Stage 4: Cabinet Production After the final measurements, cabinet production begins. A 50% production payment is required at this stage. Cabinets take 4-6 weeks to produce, while carpentry can take 2-3 months. Once done, we schedule the delivery and installation after the final payment is made. Stage 5: Installation Cabinet installation takes about 3-5 days. After that, we measure for the countertop and install it within 2 weeks, which takes 1-2 days.