Question: 2.10 Any Hidden Cost After Confirmation?
Pricing & Charges
Answer: At OLO Design 36O, we aim to maintain transparent pricing. Once the quotation has been confirmed and the project scope has been finalized, there are generally no hidden costs. All confirmed items, materials, and cabinet specifications stated in the quotation will be included in the project cost. However, additional charges may apply if there are changes or new requests after confirmation. Examples include: - Design or material changes requested after confirmation - Additional cabinets, accessories, or upgrades not included in the original quotation - Site conditions that differ significantly from the provided drawings or measurements - Additional installation trips due to site not being ready - Building management permits not obtained during scheduled installation - Requests for installation or work outside the agreed scope In such situations, any additional cost will be communicated and agreed upon with the client before proceeding. At OLO Design 36O, we believe clear communication and detailed quotations help ensure a smooth and transparent project process.